排水 - 通气管

来自HelpSystem
Dyst CN讨论 | 贡献2023年9月27日 (三) 13:32的版本 (建立内容为“<IS_HELP id="HS167"/> {{Article table |commercial_product1=InstalSystem 5 |p2 =<!--gdy jest kolejny produkt handlowy, zamienić na->"produkt_handl…”的新页面)

(差异) ←上一版本 | 已核准修订 (差异) | 最后版本 (差异) | 下一版本→ (差异)
跳转到导航 跳转到搜索
产品 InstalSystem 5
文章类型 SAMPLE PROJECT
版本的最新内容 2023-08-21


Project description

The attached projects present an exemplary solutions for a sewage installation with bypass ventilation.
Schemes A-D are applicable to buildings from 3 to 5 floors (less or equal to 12m in height).
Schema E - for the buildings with more than 5 floors (more than 12m in height).

Files to download and project information

Schema A

  • Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot, and at the top to the vent pipe;
  • 创建每层中间的通气管连接 can be made or not depending on the project features.
    1. Schema A.

    Bypass ventilation Schema A, isproj

Schema B

  • Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
  • 吸气阀 is used as an 立管顶端的部件 for both stacks (排水 and 通气管).
    2. Schema B.

    Bypass ventilation Schema B, isproj

Schema С

  • Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
  • 创建每层中间的通气管连接 are made automatically;
  • Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.
    3. Schema C.

    Bypass ventilation Schema C, isproj

Schema D

  • 吸气阀 is used on the first floor for the most distant fixture;
  • 排水通气管 are connected to the sewage stack on the floors above.
    4. Schema D.

    Bypass ventilation Schema D, isproj

Schema E

  • In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
  • The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
  • 创建每层中间的通气管连接 is declared as well;
  • The connection of the additional stack to the main stack is made automatically by the means of a "vent loop".
    5. Schema E.

    Bypass ventilation Schema E, isproj