排水 - 通气管:修订间差异
跳转到导航
跳转到搜索
(→方案 A) |
(→方案 A) |
||
| 第22行: | 第22行: | ||
==要下载的文件和项目信息== | ==要下载的文件和项目信息== | ||
===方案 A=== | ===方案 A=== | ||
* | * 直接平行通气:通气立管底部连接到排水立管最下端附近,排水立管顶部与通气管相连; | ||
* ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' | * ''<IS_TS id=LacznikiNaKazdejKondygnacji/>'' 根据项目特点,可有可无。<br/>[[File:Bypass ventilation schema A.png|900 px|left|thumb|1. 示意 A.]]<br clear="all"/>[https://download.instalsoft.com/public/helpsystem/EN/SUF/Sewage-installations-Bypass-ventilation/ISPROJ/Bypass_ventilation_Schema_A.isproj 平行通气示意图 A, isproj]</br> | ||
===Schema B=== | ===Schema B=== | ||
2023年9月28日 (四) 08:50的版本
| 产品 | InstalSystem 5 |
| 文章类型 | 项目举例 |
| 版本的最新内容 | 2023-08-21 |
项目说明
所附项目提供了一个带旁路通气的排水系统的示例性解决方案
方案 A-D 适用于3至5层(高度小于或等于12米)的建筑。
方案 E - 适用于5层以上(高度超过12m)的建筑。
要下载的文件和项目信息
方案 A
- 直接平行通气:通气立管底部连接到排水立管最下端附近,排水立管顶部与通气管相连;
- 创建每层中间的通气管连接 根据项目特点,可有可无。

1. 示意 A.
平行通气示意图 A, isproj
Schema B
- Indirect parallel ventilation: vent stack is a separate one, and is connected to the branches on each floor. Horizontal ventilation pipes are to be drawn manually, correcting the elevation where necessary;
- 吸气阀 is used as an 立管顶端的部件 for both stacks (排水 and 通气管).

2. Schema B.
Bypass ventilation Schema B, isproj
Schema С
- Direct parallel ventilation: vent stack is connected to the sewage stack at the bottom near the stack foot and at the top to the vent pipe;
- 创建每层中间的通气管连接 are made automatically;
- Connection to the vent stack from each fixture on the first floor and from each sewage branch on the floors above.

3. Schema C.
Bypass ventilation Schema C, isproj
Schema D
- 吸气阀 is used on the first floor for the most distant fixture;
- 排水通气管 are connected to the sewage stack on the floors above.

4. Schema D.
Bypass ventilation Schema D, isproj
Schema E
- In high buildings the fixtures on the lowest floors should be connected to the additional sewage pipe in the stack;
- The additional sewage pipe should be connected to the sewage collector at least 2 m from the base of the stack;
- 创建每层中间的通气管连接 is declared as well;
- The connection of the additional stack to the main stack is made automatically by the means of a "vent loop".

5. Schema E.
Bypass ventilation Schema E, isproj