Description
管路 is a component that is available within all design scopes, it forms a fragment of the piping system between two junctions where the flow can be changed. Within the following scopes: 供热系统计算, 供冷系统计算 and 给水系统计算 a 管路 may consist of multiple segments (vertical and horizontal), separated by pipe-run division points. It can be drawn as a single pipe-run or as a 管线对/ Three pipe-runs. Within the 生活排水系统计算 scope a 管路 of the 重力排水 or 通气管 type always consists of a single segment.
It is possible to specify default values for 与地面的距离(在楼层参数中设置). In addition, the user has full control over the arrangement of the pipe-runs using dedicated editors available in the 2D编辑器 and 3D视图 windows.
Location in the program
Inserting pipe-runs
- Icons associated with 管路, with 项目范围: 供热系统计算 or 供冷系统计算 activated, are available in the 2D编辑器 window in the 主工具 bar, section 水力分配 - 供热供冷系统 when the following editing scopes are enabled: 对流, 地面/墙面辐射 or 顶面辐射.

1. 管路 - 供热系统计算 or 供冷系统计算. - Icons associated with 管路, with 给水系统计算 activated, are available in the 2D编辑器 window in the 主工具 bar, section 水力分配 - 给水系统 when the 给水系统 editing scope is enabled.

2. 管路 - 给水系统计算. - Icons associated with 管路, with 生活排水系统计算 activated, are available in the 2D编辑器 window in the 主工具 bar, section 排水 when the 室内排水 editing scope is enabled.

3. 管路 - 生活排水系统计算.
Examples of use
Pipe-run dividing point and midpoint
- One 管路 may consist of several sections connected by means of midpoints.
- Two 管路 are separated by a pipe-run dividing point - a junction/node.
- Any number of additional points can be placed on a 管路 using the context menu and functions available there: 插入中间点 and 插入分割点.
- Midpoints can be changed into dividing points and vice versa:
Default distances between pipe-run and floor and between pipe-run and ceiling
In the 参数表 window it is possible to specify for a 楼层 the default distance from the floor separately for each 管路 type component and the default distance from the ceiling (for arranging ceiling panels) in the following fields:
- for 供热系统计算:
- ΔH管路,供 and ΔH管路, 回 - 在楼层参数中指定的管路至地面之间的距离(不适用于顶面辐射板的输配管路)。符号中的供指供水,回指回水.
- ΔH管路.辐射板 - 顶面辐射板输配管路至天花板的距离 .
- for 给水系统计算:
Pipe-run laying distance
- The 距离 between pipe-runs can be specified for 管线对/Three pipe-runs in the 参数表 window. After each component inserted, the last specified 距离 is memorized.

5. 距离 for 管线对.
Determining the vertical alignment of the pipe-runs - 供热系统计算, 供冷系统计算 and 给水系统计算
The alignment and elevations of a pipe-run can be managed using dedicated editors that are displayed after selecting a component in the 2D编辑器 and 3D视图 window:
- shows the elevation of the pipe-run end.
- shows the elevation of the section.
- shows the distance between pipe-run point/section and floor. 
6. Display of the elevations of a 管路 in the 2D编辑器 and 3D视图 window.
InstalSystem 5 offers three methods of managing the alignment of a distribution system that allow the most convenient method to be selected to suit the individual design context. The method should be selected in the 管道标高设置 editor in the 参数表 window for the 管路:
- 自动 mode:
- Editors showing the elevation of pipe-run ends and distance from the floor are greyed out and the values presented cannot be modified.
- The value of 标高 can be modified in the 参数表 window for the 管路 and this change automatically modifies the values in all editors for the selected component.
- 手动调整局部的标高 mode:
- In the editors available in the 2D编辑器 and 3D视图 window it is possible to specify the elevation and distance from the floor of a pipe-run section.
- Based on the difference between the specified section elevations, vertical pipe-runs are automatically created.
- Editors of pipe-runs connected on one end to terminal units are greyed out and these cannot be edited.
- The 2D编辑器 and 3D视图 windows do not display editors with elevations of vertical sections of pipe-runs.

7. 管道标高设置 - 手动调整局部的标高.
- 手动调整节点的标高:
- Editors in the 2D编辑器 and 3D视图 window enable specifying the elevations and distance from the floor of the ends of a 管路 section.
- Vertical sections of pipe-runs are NOT automatically created - the entire pipe-run layout is controlled by the user.
- Editors of pipe-runs connected on one end to terminal units are greyed out and these cannot be edited.

8. 管道标高设置 - 手动调整节点的标高.
Attention! Every change of elevations and modification of 管路 layout requires running a 检查连接 operation available on the 主工具 bar in section 计算.
Determining the vertical alignment of pipe-runs - 生活排水系统计算
The elevations and gradient of a pipe-run can be managed using dedicated editors that are displayed after selecting a component in the 2D编辑器 and 3D视图 window:
- shows the elevation of pipe-run sections, values presented in the editors correspond to the fields: 第一个节点标高 and 第二个节点标高 available in the 参数表 window of the component.
- shows the gradient of the pipe-run and corresponds to the 实际坡度 field available in the 参数表 window of the component.
5. Display of elevations and gradient of a 管路 in the 2D编辑器 and 3D视图 window.
When laying the pipe-runs, they adopt a gradient according to the direction of flow to the sewage outlet, taking into account the settings made in the 一般参数 window on the 生活排水系统计算/ 计算标准和选项 tab:
- The default minimum gradients specified for the selected component locations are adopted. In addition, the pipe-run laying algorithm takes into account the elevation and gradient values specified by the user in the editors described above.
- The 器具排水管的连接方向控制 is taken into account:
- for the 朝向地板 setting - pipe-runs are arranged towards the terminal units with minimum gradient. If necessary, vertical pipe-runs at the terminal units are added taking into account the value specified in 排水横支管在立管上的连接点与地面完成面的距离 field,
- for the 朝向墙体 setting - pipe-runs are arranged downstream of the terminal unit with the gradients specified in the 一般参数 window, and they are then connected to the collective branch by means of a vertical pipe-run (if drawing it is necessary for the continuity of the system).

9. Alignment of pipe-runs - 生活排水系统计算.
Laying pipe-runs in a single vertical plane
- Appropriate setting of elevation values of individual types of pipe-runs in the 参数表 window for a 楼层 in sections: 供热/供冷系统 or 给水系统 and specifying the minimum value in the 距离 field in the 参数表 window of a 管线对/ Three pipe-runs, enable aligning pipe-runs in one vertical plane, e.g. in a wall one over the other.
Inclined pipe-runs
- The 管道标高设置 function enables full control over the alignment of a pipe-run, which, together with the possibility of marking points on a component, makes it possible to draw inclined pipe-runs and to design the connections of systems located on inclined attic elements.
Basic rules of connecting pipe-runs to other system components
The 主工具 bar in the 编辑 group offers three methods of automatic connecting of terminal units to the pipe-run arrangement drawn beforehand:

- 自动连接末端装置 - connects selected 管路 components and terminal units within the following scopes: 供热系统计算, 供冷系统计算 and 给水系统计算.
- 自动用活水三通连接件连接末端用水点 - connects selected 管路 components and terminal units of a water supply system in a tee joint system.
- 串联连接 - connects 顶面辐射板/毛细管网 or 墙面辐射板/毛细管 components selected beforehand using a 串联连接 type pipe-run. 更多信息,见: Designing panel (ceiling, wall) heating/cooling systems.
For all components connected to a system (e.g. 末端装置, 混水装置, 分/集水器), a horizontal pipe-run section 5cm long is drawn, followed by a bend to arrive at the defined elevation of the 管路. Exceptions from this rule:
- Connection of a 散热器 with an integrated angled valve - a horizontal pipe-run section is drawn of a length of: 与墙壁的距离 + 5cm, followed by a bend to arrive at the defined elevation of the 管路.
- Connection of a 供水水龙头 - a horizontal pipe-run section 1cm long is drawn, followed by a bend to arrive at the defined elevation of the 管路.

11. Connection of a 供水水龙头. - Connection of a 立管 - if the pipe-run connection is made directly, with no midpoints, the pipe-run elevation adopted corresponds to the actual value in accordance with the data given in the 参数表 window of the 管路.
- Connection of a 混水装置/控制回路 - the 自动连接末端装置 operation results in connecting only the points that are on the primary side of the 混水装置.
Pipe-run in auto mode
When pipe-runs have been drawn in a project in such a way that within one storey there are vertical pipe-runs (created not by inserting a 立管, but by connecting four pipe-runs or pipe-run pairs), pipe-runs to be connected to these vertical sections are subject to defined drawing rules:
- when drawing components with the Auto mode enabled, the 管路 is connected to the vertical pipe-run with its elevation retained.
- when connecting a pipe-run to pipe-runs the coordinates of which overlap, the 管路 drawn is connected to the component of the lowest elevation.

12. Connection to vertical pipe-runs.