钢制吊顶辐射板
跳转到导航
跳转到搜索
课程内容
本文介绍了辐射版顶面供暖系统。
模块和程序的配置
- InstalSystem 5需带有如下模块:
- 顶面/墙面辐射板供暖/供冷系统
初始状态
已定义建筑结构(楼层,房间)、并提供了楼层的平面图,房间中已指定供热和供冷的负荷值。
操作步骤
载入项目所需的目录并设置省缺的参数
一般参数 窗口
| 项目文件
|
初始状态, isproj 公共建筑顶面辐射板供暖供冷系统的设计, isproj |
| 设计时使用 | InstalSystem 5 Rev. Beta 33 |
| 所需模块 | InstalSystem 基本模块 基本辐射系统 5 辐射板系统 5 |
| 项目范围 | 辐射供热 |
| 所用的产品目录 |
基本辐射系统 |
| 建筑类型 | 商业建筑 带地下室 2层 |
| 建筑结构 | Ground floor base drawing, dwg First floor base drawing, dwg |
| 图纸范围 | Plan drawings |
| 设计者 | www.instalsoft.com |
| 法律免责声明 | Copy all or fragments allowed |
| 计算结果 | Complete range of calculation results, xls Complete range of available printouts, pdf Heating calculation results, pdf Bill of materials, pdf |
| 设计图纸 | Ground floor, dwg |
- 项目范围 tab - set the scope of project: 供热系统计算.
- 目录 tab – load product catalogues required for the project.
- 供热/供冷系统计算/源 tab – verify the parameters: 默认情况下所使用的源 and supply temperature (θ供,供热).
- 供热/供冷系统计算/水力分配系统/假想的辐射系统连接 tab - select 允许系统无分集水器.
- 供热/供冷系统计算/水力分配系统/Pipes and insulation - default types and data tab – specify default pipe and insulation type, verify other data.
- 楼层管理 tab – verify and specify basic parameters:
- 楼层高度
- Default distance between ceiling and distribution pipe-runs to radiant panel system (ΔH管路.辐射板)
- Default distance between ceiling and radiant panels by entering the value in field (吊顶厚度)
- 辐射系统/辐射板/毛细管网 tab – specify default types and sizes of radiant panels and adjust minimum (Δθ 最小) and maximum (Δθ 最大) permissible drop of temperature of the medium. The program will determine an optimum value within that interval for each radiant panel in order to attain the required output.
更多信息,见: General data
Edit installation - radiant ceiling panels
Insert radiant panels and edit graphically
Verify the arrangement of radiant panels, i.e. distances between panels, distances to top slab and external walls, with manufacturer's guidelines.
- Select 顶面辐射.
- Using the 捕捉 mode settings specify the desired distance between radiant panel and external wall.
1. Radiant ceiling panel - Insert the radiant panel using the icon 顶面辐射板/毛细管网 in group 辐射
- Adjust the length of the radiant panel to the dimensions of the room by dragging terminal points of the panel and expanding it.
The length of the panel in the drawing does not have to correspond to the real length of a single panel. Based on the required length, the program will assemble a set of base panels and connection headers connected in series with its total length coresponding to the required length. - Insert subsequent radiant panels by clicking again the 顶面辐射板/毛细管网 icon or by copying panels already inserted. When necessary modify the settings of the 捕捉 mode.
Initial calculations - diagnostics of the heat demand coverage in room
- Run radiant heating calculations by clicking the
icon in the 计算 group. - Verify the heat demand coverage in room in:
- the 诊断 window by viewing the list of warnings
- the 结果 window in the 房间清单 - 供暖 tabs
- the hint bubble displayed upon positioning the mouse cursor within the panel area
Modify data to adjust the attained output to the required output
- Adjust the following data and parameters:
- Recalculate the project – verify the effect of the changes made on the attained heating output.
Edit installation - append drawings with the medium distribution system
- Upon attaining satisfactory results for the coverage of heat demand in rooms, insert the other components of the system (source, pipe-runs, fittings) and connect them to the radiant panels.
Make complete calculations including system balancing and bill of materials
- Make calculations for radiant heating by clicking the
icon in the 计算 group. - Verify the diagnostics and calculation results, in particular:
- Required source parameters - the 结果 window – 供热结果/一般供热结果 tab
- Flow balance – the 结果 window – 回路 tab
- Bill of materials - the 结果 window – 材料清单 - 供暖 / 供冷 tab
更多信息,见: Calculations and diagnostics
Verify visually arrangement of the system in 3D view
- Open the 3D视图 window and check system arrangement. If necessary, modify the elevations of the components and positions of connection points. Recalculate the project if corrections were made.
更多信息,见: Verification of the correctness of installation structure3. 3D view
Prepare drawings for printing/export
- Verify the drawing style of the panel in 2D and 3D views and the level of detail of information provided in the label. Configuration is given in the 一般参数 window.
- Insert and set labels of other system components (source, pipe-runs, fittings).
更多信息,见: Preparation of drawings for export/printing